OUR PROJECTS

OUR PROJECTS

LIST PROJECTS UNDERTAKEN

[1]

Project: Perkhidmatan penggerudian  telaga tiub dan pembinaan sistem penyaluran air bawah tanah

Location: Sabah

Client: Agensi Remote Sensing Malaysia (ARSM)

15 Nov 2018 – 18 Jan 2019

[2]

Project: Perkhidmatan survey geofizik menggunakan kaedah keberintangan bagi mendapatkan profil bawah permukaan di pusat penternakan ikan berdensiti tinggi

Location: Pagoh, Johor 

Client: Lembaga Kemajuan Ikan Malaysia (LKIM)

30 Okt – 3 Dec 2018

[3]

Project: Cadangan Kerja-Kerja Kaji Selidik Tanah Bagi Talian Atas 500kv untuk 1000-1200 Mw Pulau Indah Combined Cycle Gas-Fired Power Plant

Location: Pulau Indah, Klang, Selangor Darul Ehsan

Client: TNB Repair and Maintenance Sdn Bhd (TNB REMACO)

29 Nov 2018 – 31 Jan 2019

[4]

Project: Perkhidmatan penggerudian dan pembinaan telaga tiub  air tanah (NAWAB)  

Location: Madrasah Tahfiz Sri alam, Gombak.

Client:  Jabatan Minerals dan Geosains Selangor (JMG SELANGOR)

[5]

Project: Perkhidmatan penggerudian dan pembinaan telaga tiub  air tanah (NAWAB) 

Location: Hospital Serdang, Selangor

Client:  Jabatan Minerals dan Geosains Selangor (JMG SELANGOR)

[6]

Project: Perkhidmatan  membekal, membina dan mengujilari  sistem rawatan ringkas SPART air bawah tanah

Location: Masjid Ar- Rahman, Sungai Lui, Selangor

Client:  Jabatan Minerals dan Geosains Selangor (JMG SELANGOR)

1 – 16 Nov 2018   

[7]

Project: Soil investigation work along the culvert barrel at km16.76 & 18.63 both bound section C4,  New Klang Valley Expressway

Location: New Klang Valley Expressway

Client:  Prestasi Asia (M) Sdn Bhd

10 – 16 Oct 2018

[8]

Project: Electrical resistivity and ground penetration radar (GPR) measurement at KM 18.63 and  KM 16.76 Both Bound  Section C4, New Klang Valley Expressway

Location:  New Klang Valley Expressway

Client:  Rintis Venture Sdn Bhd

25 Sep – 4 Oct 2018

[9]

Project: Perkhidmatan Survei Geofizik Menggunakan Kaedah Graviti, Keberintangan-2D dan Pengutuban Teraruh (IP) Bagi Menentukan Zon Pemineralan Timah Primer di Kawasan Hutan Simpan Gunung Bongsu, Kulim, Kedah

Location: Kulim, Kedah

Client: Jabatan Mineral dan Geosains Kedah, Perlis dan Pulau Pinang

27 – 23 July 2018

[10]

Project: 2D Electrical Resistivity Measurement at Kg. Bukit Pagar and Sek. Keb. Laloh, Kuala Krai, Kelantan

Location: Kuala Krai, Kelantan

Client: Malaysian Medical Relief Society (MERCY MALAYSIA)

21 – 22 July 2018

[11]

Project: Subsurface investigation using geophysical 2D resistivity survey at Muar and Ulu Tiram, Johor

Location: Ulu Tiram and Pagoh, Muar, Johor

Client: Jabatan Mineral Dan Geosains Negeri Johor

4 -9 June 2018

[12]

Project: Kerja-Kerja Penyiasatan Tanah & Ujian Makmal Bagi Cadangan Projek Mahkamah Baharu Pengerang, Johor

Location: Pengerang, Johor

Client: Jabatan Kerja Raya Malaysia (CKG)

8 May – 3 July 2018

[13]

Project: Kerja-Kerja Penyiasatan Geofizik Bagi Menentukan Potensi Sumber Air Bumi Di Loji Rawatan Air Sungai Siput Dan Loji Rawatan Air Gadek, Melaka.

Location: Kg. Sungai Siput dan Kg. Sungai Gadek, Melaka

Client: Badan Kawal Selia Air Negeri Melaka (BKSA)

27 Mac – 6 April 2018

[14]

Project: Resistivity measurement for ground water

Location: Kota Tinggi, Johor

Client: NZ URUSBINA SDN BHD

22 – 24 Feb 2018

[15]

Project: Geophysic Survey for Ground Water Potential for Paddy Field Irrigation

Location: Junjungan 1, Junjungan 2 dan Bebuluh, Brunei Darussalam

Client: Kementerian Sumber Asli dan Pelancongan, Brunei

25 – 30 Jan 2018

[16]

Project: Resistivity measurement for Kaolin Clay detection

Location: Tanjung Rambutan, Perak

Client: Kaolin World (M) Sdn Bhd

11 -21 Dis 2018

[17]

Project: Resistivity measurement for ground water

Location: Darul Ta’lim, Hulu Langat, Selangor

Client: Soul Paradise Sdn Bhd

30 – 31 Oct 2017

[18]

Project: Resistivity Measurement for Ground Water  

Location: Kemasik and Besut, Terengganu

Client: JMG Terengganu

11 – 15 Oct 2017

[19]

Project: Resistivity measurement for ground water

Location: Kg. Jongkok Batu, Dungun, Terengganu

Client: Fendy Construction Sdn Bhd/ JMG Terengganu

19 – 22 Sept 2017

[20]

Project:Inspection and preparation of maintenance report for water level sensor 

Location: Malaysian Japanese Industrial Institute (MIJI) Beranang, Selangor

Client: MJII, Beranang, Selangor

4 August 2017

[21]

Project: Resistivity measurement ground water 

Location: Gunong, Bachok, Kelantan

Client: Fendy Construction Sdn Bhd/ Kementerian Pertanian Malaysia (Kelantan)

17 July 2017

[22]

Project: Resistivity measurement for ground water

Location: Jedok, Tanah Merah, Kelantan

Client: Fendy Construction Sdn Bhd

22 Jun 2017

[23]

Project: Preliminary study on the potential of ground water at Lahad Datu

Location: Felda Sahabat, Lahad Datu, Sabah

Client: Encorp Construction & Infrastructure Sdn Bhd

9 Jun 2017

[24]

Project: Pumping Test and Hydrogeology Study

Location: Simpang Renggam Kluang, Johor

Client: Maju Jaya

30 April –  30 May 2017

[25]

Project: Resistivity measurement for ground water

Location: Istana Pasir Pelangi, Johor

Client: Istana Pasir Pelangi, Johor

15 Feb 2017

[26]

Project: Pumping Test

Location: Istana Pasir Pelangi

Client: Prima Beringin Sdn Bhd

14 Jan 2017

[27]

Project:Resistivity measurement for ground water

Location: Lojing, Kelantan

Client: Fendy Construction Sdn Bhd/ KADA

10 Jan 2017

[28]

Project: Resistivity Measurement for ground water

Location: Tok Kenali and Tok Bali, Kelantan

Client: ASAS Bina Sdn Bhd/ AKSB

19 Dec 2016

[29]

Project: Resistivity measurement for ground water

Location: Tg. Mas and Ketereh, Kelantan

Client: Fendy Construction Sdn Bhd

29 Nov 2016